Two jobs often travel together in modern field work: area from coordinates (UTM or local grid) and NOS recovery of a missing bend from chain survey geometry. This page keeps both practical. For the pure NOS derivation with plates, see the NOS cutting-point guide.
Part A — Area from UTM (or any plane grid) coordinates
A1. When this applies
- You have ordered boundary points (Easting, Northing) in one projected system (e.g. UTM zone for your district).
- All points use the same zone / false origin — never mix zones without transforming.
- The polygon is closed (last point = first, or software closes it).
A2. Surveyor’s formula (plane)
For vertices (xᵢ, yᵢ), i = 1…n (x = Easting, y = Northing):
Area = ½ | Σ (xᵢ yᵢ₊₁ − xᵢ₊₁ yᵢ) | with (xₙ₊₁, yₙ₊₁) = (x₁, y₁).
Result is in square units of the grid (m² if coordinates are in metres). Convert to acres/hectares as needed.
A3. Field / office checklist
- Plot points in order around the boundary (clockwise or counter-clockwise — absolute value removes sign).
- Reject duplicate consecutive points and obvious GPS spikes.
- Compare with FMB/RSR extent; large gaps need explanation (wrong point order, wrong projection, missing bend).
- Use the site tools:
- Coordinates area calculator
- Land area calculator (chain / figure method)
A4. GNSS caveats
- CORS / RTK quality affects vertex accuracy; area inherits point error.
- Legal cadastral boundary is still the survey mark + FMB process, not a single GNSS track alone.
Part B — NOS (nearest offset segment) for missing bends
B1. Problem
Point B is missing; points A and C are intact. FMB gives sides of triangle ABC. You need foot of perpendicular D on AC and offset BD to re-plant B without trial-and-error swinging of both chains.
B2. Steps
- Take sides a = BC, b = AC, c = AB from FMB (or remeasure AC on ground).
- Compute cutting distance AD along AC (cosine / projection form of the triangle).
- Check AD + CD ≈ AC.
- Offset BD = √(c² − AD²) or from area: BD = 2×Area(ABC)/b.
- On ground: mark D from A, set right angle, measure BD, verify AB and CB.
Full formula plates: NOS guide.
B3. When NOS is the wrong tool
- More than one point missing on the same figure — rebuild control first.
- AC itself is wrong or blocked — re-establish baseline.
- Dispute is about title, not geometry — escalate to revenue process.
Part C — Putting both together
Modern resurvey may give you UTM parcels for GIS checks while maintenance still uses chain FMB. Use coordinates for area QA and maps; use NOS / D&O for recovering physical marks consistent with the FMB.
Related: D&O system · GIS viewer · Parcel boundary checker

Corrections & questions
These guides are maintained for practising AP surveyors. If a step is outdated or wrong, tell us — we prioritise field corrections.
Comments are not stored on this page. The report form attaches this URL automatically.